Two engineers reviewing server racks and manufacturing equipment inside an advanced facility

Category

Program & Project Management

Why Milestone Schedules Fail Without a Level 3 Schedule Behind Them

Milestone schedules only work when a detailed Level 3 schedule sits behind them. Without it, missed dates arrive as a surprise.

Read more →

How to Choose an EV Battery Plant Construction Management Partner

Fab and battery plant construction share vocabulary but not risk profile. Here's what to ask before assuming a firm's advanced manufacturing experience actually covers your project.

Read more →

Schedule Float Is Not a Buffer You're Allowed to Spend

Float isn't a personal reserve for whichever activity falls behind first — it's the project's shared capacity to absorb risks that haven't happened yet.

Read more →

What an Owner's Representative Actually Does That a PM Doesn't

A PM manages the project. An owner's representative answers to the owner. On capital projects, that distinction is the whole job.

Read more →

The Real Reason Change Orders Spiral on Advanced Manufacturing Projects

Change orders get blamed on scope creep or poor planning. Often the real driver is simpler: a decision made without checking it against every system it touches, discovered downstream by someone else.

Read more →

The Owner's Project Requirements Document Nobody Reads Until It's Too Late

The OPR is supposed to be the single source of truth for what a facility has to do. On most projects it gets written once, filed, and never checked against again until commissioning finds the gap.

Read more →